MDML7262 | DESIGN OF MINING OPERATIONS | 3+0+0 | ECTS:7.5 | Year / Semester | Fall Semester | Level of Course | Third Cycle | Status | Elective | Department | DEPARTMENT of MINING ENGINEERING | Prerequisites and co-requisites | None | Mode of Delivery | Face to face, Practical | Contact Hours | 14 weeks - 3 hours of lectures per week | Lecturer | Doç. Dr. Kadir KARAMAN | Co-Lecturer | | Language of instruction | Turkish | Professional practise ( internship ) | None | | The aim of the course: | 1. Operations of Mining license field and preparation of manufacturing projects
2. Reserve calculations from drilling data and 3D modeling
3. Open pit (bench, tails, ramp) and underground Gallery designPatlatma,
4. Ventilation and road designing
|
Programme Outcomes | CTPO | TOA | Upon successful completion of the course, the students will be able to : | | | PO - 1 : | Able to know license boundary drawing, field measurement | 4,5 | 4,6, | PO - 2 : | Able to prepare manufacturing map, take sections, cubage | 4,5 | 4,6, | PO - 3 : | Reserve calculation, bench, blasting and gallery designing | 4,5 | 4,6, | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), PO : Learning Outcome | |
Introduction (Introducing Netpromine software), processing of Mining license (boundary drawing, field measurement, editing the sheet sides), Mine manufacturing project works (bench and slope design, cross sectioning, longitudinal section, cubage), 3D demonstration of Mining license and manufacturing, adding a satellite image, topographic map operations (preparing contour line, elevation), 3D demonstration of CSV folders, solid model, block model operations, reserve calculation, open-pit bench design, ramp and tails design, blasting and its environmental effects, underground gallery and ventilation design |
|
Course Syllabus | Week | Subject | Related Notes / Files | Week 1 | Overview of the course content (inform of map, coordinate, datum, software), references | | Week 2 | Processing of Mining license (boundary drawing, field measurement, editing the sheet sides) | | Week 3 | Mine manufacturing project works for current condition (triangular model, bench and slope design, cross sectioning, longitudinal section) | | Week 4 | Mine manufacturing project works for after excavation (triangular model, bench and slope design, cross sectioning, longitudinal section) | | Week 5 | Adding 3D demonstration of Mining license and manufacturing | | Week 6 | Topographic map operations (preparing contour line, elevation) | | Week 7 | 3D demonstration of CSV folders | | Week 8 | Solid model, block model operations, reserve calculation | | Week 9 | Midterm exam | | Week 10 | Open-pit bench and ramp design | | Week 11 | Field of tailing and ramp design | | Week 12 | Road design between open pit and tailing field | | Week 13 | Blasting and its environmental effects | | Week 14 | underground gallery and ventilation design | | Week 15 | 3D modeling | | Week 16 | Final exam | | |
1 | GIS/CAD Uygulamaları, 2008, Netcad Kampüs, Eğitim Kitapları Serisi, Başak Matbaacılık, 433 s, Ankara | | |
1 | portal.netcad.com.tr/uygulama_dokumanları_madencilik_uygulamaları | | |
Method of Assessment | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | Practice | 9 | | 120 | 50 | Homework/Assignment/Term-paper | 15 | | 120 | 50 | |
Student Work Load and its Distribution | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | Yüz yüze eğitim | 3 | 14 | 42 | Sınıf dışı çalışma | 6 | 14 | 84 | Arasınav için hazırlık | 6 | 7 | 42 | Uygulama | 2 | 1 | 2 | Proje | 6 | 6 | 36 | Dönem sonu sınavı | 3 | 1 | 3 | Total work load | | | 209 |
|