|
|
| ESM3018 | Energy Transmission Lines | 2+1+0 | ECTS:4 | | Year / Semester | Spring Semester | | Level of Course | First Cycle | | Status | Compulsory | | Department | DEPARTMENT of ENERGY SYSTEMS ENGINEERING | | Prerequisites and co-requisites | None | | Mode of Delivery | | | Contact Hours | 14 weeks - 2 hours of lectures and 1 hour of practicals per week | | Lecturer | Dr. Öğr. Üyesi Ömür AKYAZI | | Co-Lecturer | Dr. Öğr. Üyesi Erhan SESLİ | | Language of instruction | Turkish | | Professional practise ( internship ) | None | | | | The aim of the course: | | This course provides basic knowledge about energy transmission systems. |
| Learning Outcomes | CTPO | TOA | | Upon successful completion of the course, the students will be able to : | | | | LO - 1 : |
Install Pole, Poles Travers, Insulators and other elements. | 1 - 5 | 1, | | LO - 2 : | Attract and Link overhead line conductors. | 1 - 5 | 1, | | LO - 3 : | Make maintenance of Poles, Equipment and the lines. Take care for the panels and metering systems. | 1 - 5 | 1, | | LO - 4 : | Assemble power Transformer, Size Transformer, Busbar system, splitter, cutter. | 1 - 5 | 1, | | LO - 5 : | Solve the problems related to power distrubition systems. | 1 - 5 | 1, | | LO - 6 : | Design power transmission lines and cables. | 1 - 5 | 1, | | LO - 7 : | Solve the problems related to voltage drops in power transmission systems. | 1 - 5 | 1, | | LO - 8 : | Solve power factor correction problems and design power systems that transmits quality power. | 1 - 5 | 1, | | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), LO : Learning Outcome | | |
| Production, transmission and distribution facilities. Conductors and isolators. Poles and choice. Separators, cutters. Bar and bara systems. Power Transformer and Distribution Transformers. |
| |
| Course Syllabus | | Week | Subject | Related Notes / Files | | Week 1 | Introduction to electrical installations | | | Week 2 | General structure, units and properties of a production facility | | | Week 3 | Electric networks and conductors used in electricity transmission. | | | Week 4 | Masts used in energy transmission lines.
| | | Week 5 | Isolators; Structure, types and properties
| | | Week 6 | Power switches; Separators, types, properties
| | | Week 7 | Bar and bara systems
| | | Week 8 | Power Transformer and Distribution Transformers
| | | Week 9 | Mid-term exam | | | Week 10 | Structure of Distrubition Systems
| | | Week 11 | Structure of Distrubition Systems
| | | Week 12 | Voltage Drop
| | | Week 13 | Voltage Drop | | | Week 14 | Calculation of crosseection area | | | Week 15 | Calculation of crosseection area | | | Week 16 | End-of-term exam | | | |
| 1 | Bayram, Mustafa. 1991; Elektrik Tesisleri ile İlgili Sorular ve Çözümleri, İTÜ Yayınları | | | |
| 1 | Ceylan, Murat, 2012; Elektrik Enerji Santralleri ve Elektrik Enerjisi İletimi ve Dağıtımı,Seçkin Yayınevi | | | 2 | Saner, Yetkin, 2000; Güç Dağıtımı-1 (Enerji Dağıtımı), Birsen Yayınevi | | | 3 | Saner, Yetkin, 2015; Güç Dağıtımı-5 Kesit Hesapları, Birsen Yayınevi | | | 4 | Saner, Yetkin, 2012; Güç Dağıtımı-4 Kısa Devre Hesapları, Birsen Yayınevi | | | 5 | Saner, Yetkin, 2016; Güç Dağıtımı-2 Dağıtım Transformatörleri, Birsen Yayınevi | | | |
| Method of Assessment | | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | | Mid-term exam | 9 | 17.04.2024 | 2 | 50 | | End-of-term exam | 16 | 06.06.2024 | 2 | 50 | | |
| Student Work Load and its Distribution | | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | | Yüz yüze eğitim | 3 | 14 | 42 | | Sınıf dışı çalışma | 2 | 14 | 28 | | Arasınav için hazırlık | 10 | 2 | 20 | | Arasınav | 2 | 1 | 2 | | Ödev | 1 | 6 | 6 | | Dönem sonu sınavı için hazırlık | 2 | 10 | 20 | | Dönem sonu sınavı | 2 | 1 | 2 | | Diğer 1 | 2 | 3 | 6 | | Total work load | | | 126 |
|