MINE2019 | Computer Aided Mine Planning | 2+2+0 | ECTS:4 | Year / Semester | Fall Semester | Level of Course | First Cycle | Status | Elective | Department | DEPARTMENT of MINING ENGINEERING | Prerequisites and co-requisites | None | Mode of Delivery | | Contact Hours | 14 weeks - 2 hours of lectures and 2 hours of practicals per week | Lecturer | Doç. Dr. Kadir KARAMAN | Co-Lecturer | None | Language of instruction | | Professional practise ( internship ) | None | | The aim of the course: | To have a good command of mining applications in two dimensions |
Learning Outcomes | CTPO | TOA | Upon successful completion of the course, the students will be able to : | | | LO - 1 : | Have basic map and projection knowledge | 3,4 | 1,3,4, | LO - 2 : | Project designing of mine permit fields with Netcad 7 GIS | 3,4 | 1,3,4, | LO - 3 : | Generate the mining manufacturing plans with Netcad 7 GIS | 3,4 | 1,3,4, | LO - 4 : | Perform cubing (according to cross-section, prismatic method and base) | 3,4 | 1,3,4, | LO - 5 : | Transfer mine manufacturing plans to three ddimensional media | 3,4 | 1,3,4, | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), LO : Learning Outcome | |
Basic map and projection knowledge, Georeferencing, adding the online map to projects, Triangle model processes, Volume calculation of mine, Preparing the manufacturing plans according to MAPEG format, Combining of result projects, 3D processes |
|
Course Syllabus | Week | Subject | Related Notes / Files | Week 1 | Basic map and projection knowledge | | Week 2 | Arrengement, query and data production processes with Netcad 7 GIS | | Week 3 | Georeferencing, adding the online map to projects, search for mine location with Geocoding | | Week 4 | Project designing of mine permit fields with Netcad 7 GIS | | Week 5 | Generating of Digital Terrain Models belonging to mining field with Netcad 7 GIS | | Week 6 | Generating the mining manufacturing plans with Netcad 7 GIS | | Week 7 | Perspective definition, preparing perspective views of objects | | Week 8 | Generating the manufacturing plans after excavation | | Week 9 | Mid-term exam | | Week 10 | Process of izohips, triangle model process | | Week 11 | Cubing (from cross section, prismatic method and base) | | Week 12 | Preparing the manufacturing plans according to MIGEM format | | Week 13 | Combining the projects (imalat, Ruhsat etc,) | | Week 14 | Transferring the mine manufacturing plans to three dimensional environment | | Week 15 | 3D modelling | | Week 16 | End-of-term exam | | |
1 | French, T.E., and C.J. Vierick, 1978, Engineering Drawing and Graphic Technolgy 12th ed., McGRaw-Hill, NY. | | 2 | Portal.netcad.com.tr | | |
Method of Assessment | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | Mid-term exam | 9 | | | 30 | Project | 12 | | 120 | 20 | End-of-term exam | 15 | | 1,5 | 50 | |
Student Work Load and its Distribution | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | Yüz yüze eğitim | 2 | 14 | 28 | Sınıf dışı çalışma | 2 | 14 | 28 | Arasınav için hazırlık | 10 | 1 | 10 | Arasınav | 2 | 1 | 2 | Uygulama | 2 | 14 | 28 | Proje | 3 | 4 | 12 | Dönem sonu sınavı için hazırlık | 10 | 1 | 10 | Dönem sonu sınavı | 2 | 1 | 2 | Total work load | | | 120 |
|