|
MIM7370 | Wood-Based Prefabricated Systems | 3+0+0 | ECTS:7.5 | Year / Semester | Fall Semester | Level of Course | Third Cycle | Status | Elective | Department | DEPARTMENT of ARCHITECTURE | Prerequisites and co-requisites | None | Mode of Delivery | Face to face, Group study, Practical | Contact Hours | 14 weeks - 3 hours of lectures per week | Lecturer | -- | Co-Lecturer | None | Language of instruction | Turkish | Professional practise ( internship ) | None | | The aim of the course: | To introduce wood-based prefabrication systems and discuss design possibilities |
Programme Outcomes | CTPO | TOA | Upon successful completion of the course, the students will be able to : | | | PO - 1 : | compare wood-based prefabrication systems and the other prefabrication systems. | 3,4,5,6,8 | 1,3 | PO - 2 : | sketch belonging to wood-based prefabrication building. | 3,4,5,6,8 | 1,3 | PO - 3 : | design different combination details. | 4,5,8,9 | 1,3 | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), PO : Learning Outcome | |
Concept of prefabrication. Wood-based prefabrication systems and their historical evolution. General principle and material using in wood-based prefabrication systems. Classification of wood-based prefabrication systems: Low-storeyed, multi-storeyed and large span wood prefabricated buildings, With wood-based prefabricated systems design and detailed possibilities (modular coordination, connections, etc.).Applications from the world and Turkey. |
|
Course Syllabus | Week | Subject | Related Notes / Files | Week 1 | Prefabrication concept | | Week 2 | Wood-based prefabricated systems and their historical evolution | | Week 3 | In wood-based prefabrication systems general principle and material using. | | Week 4 | Classification of wood-based prefabrice systems: Low-storeyed wood prefabricated systems, Multi-storeyed wood prefabricated systems,Large-span wood prefabricated systems | | Week 5 | Low-storeyed wood prefabricated systems | | Week 6 | Multi-storeyed wood prefabricated systems | | Week 7 | Multi-storeyed wood prefabricated systems | | Week 8 | Large-span wood prefabricated systems | | Week 9 | Mid-term exam
| | Week 10 | Large-span wood prefabricated systems | | Week 11 | Applications | | Week 12 | Presentation | | Week 13 |
Applications | | Week 14 | Applications | | Week 15 | Applications | | Week 16 | Final exam | | |
1 | Volz, M., 2004, Timber Construction Manuel, Birkhauser, Germany | | 2 | Götz, K.H., 1989, Timber Design and Constructions Sourcebook, Mc-Graw-Hill Publishing, USA | | 3 | Parlar, E.,2000, Ahşap Prefabrike Sistemler ve Uygulama Olanakları, Yüksek Lisans Tezi, G.Ü., Fen Bilimleri Enstitüsü, Ankara | | 4 | Morley, M., 2000, Building with Structural Insulated Panels(SIPS), The Taunton Press,USA | | |
1 | Eşiyok, Ü.,2000, Konut Üretiminde Prefabrikasyona Bağlı Teknolojiler, Yüksek Lisans Tezi, İ.T.Ü., Fen Bilimleri Enstitüsü, İstanbul | | 2 | Bozkır, M., 2001, Hafif Prefabrike Sistemlerle Afet Sonrası Acil Konut Üretiminde Malzeme Seçimi ve Yapı Fiziği Sorunları, Yüksek Lisans Tezi, M.S.Ü., Fen Bilimleri Enstitüsü, İstanbul | | |
Method of Assessment | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | Mid-term exam | 9 | 23/11/2018 | 3,00 | 30 | Presentation | 12 | 07/12/2018 | 2,00 | 20 | End-of-term exam | 16 | 11/01/2019 | 3,00 | 50 | |
Student Work Load and its Distribution | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | Laboratuar çalışması | 0 | 0 | 0 | Uygulama | 0 | 0 | 0 | Klinik Uygulama | 0 | 0 | 0 | Ödev | 0 | 0 | 0 | Proje | 0 | 0 | 0 | Diğer 1 | 1 | 10 | 10 | Diğer 2 | 0 | 0 | 0 | Total work load | | | 10 |
|