INS7430 | Asphalt Cold Mixes | 3+0+0 | ECTS:7.5 | Year / Semester | Spring Semester | Level of Course | Third Cycle | Status | Elective | Department | DEPARTMENT of CIVIL ENGINEERING | Prerequisites and co-requisites | None | Mode of Delivery | Face to face | Contact Hours | 14 weeks - 3 hours of lectures per week | Lecturer | -- | Co-Lecturer | None | Language of instruction | Turkish | Professional practise ( internship ) | None | | The aim of the course: | The objective of this course is to give basic knowledge about emulsified asphalt cold mix issue to graduate student. |
Programme Outcomes | CTPO | TOA | Upon successful completion of the course, the students will be able to : | | | PO - 1 : | learn asphalt cold mix concept, asphalt cold mix materials, emulsified and cut-back asphalts, and cold mix aggregates. | 5,8 | 1,3 | PO - 2 : | realize the advantages and limitations of asphalt cold mix. | 5,8 | 1,3 | PO - 3 : | apply asphalt cold mixes and make quality controls. | 1,2,3,5,11 | 1,3 | PO - 4 : | do aggregate tests and mixing design (especially Marshall Method). | 1,2,3,5,11 | 1,3 | PO - 5 : | gain konowledge about mixing equipment for mixed-in-place and plant-mix applications. | 5,11 | 1,3 | CTPO : Contribution to programme outcomes, TOA :Type of assessment (1: written exam, 2: Oral exam, 3: Homework assignment, 4: Laboratory exercise/exam, 5: Seminar / presentation, 6: Term paper), PO : Learning Outcome | |
The concept of asphalt cold mix. Asphalt cold mix materials. Emulsified and Cut-Back asphalts. Cold mix aggregates. Advantages of the asphalt cold mix. Limitations of the asphalt cold mix. Application. Quality control. Preparation of the roadbased as suitable for cold mix. Aggregate tests. Mixing design. Modified Marshall Method for cold mix design. Mixing equipment for mixed-in-place and plant-mix. |
|
Course Syllabus | Week | Subject | Related Notes / Files | Week 1 | The Concept of Asphalt Cold Mix | | Week 2 | Asphalt Cold Mix Materials | | Week 3 | Emulsified and Cut-back Asphalts | | Week 4 | Emulsified and Cut-back Asphalts | | Week 5 | Cold Mix Aggregates | | Week 6 | Addventages of The Asphalt Cold Mix | | Week 7 | Limitations of The Asphalt Cold Mix | | Week 8 | Applicaiton of Cold Mix | | Week 9 | Mid-term exam | | Week 10 | Quality Control | | Week 11 | Praparation of The Roadbased as suitable for Cold Mix | | Week 12 | Aggregate Tests | | Week 13 | Cold Mixing Design | | Week 14 | Modified Marshall Method for Cold Mix Design | | Week 15 | Modified Marshall Method for Cold Mix Design,Mixing Equipment for Mixed-in-Place and Plant-Mix | | Week 16 | End-of-term exam | | |
1 | Oruç, Ş. 2002; Yoğun Granülometrili Emülsifiye Asfalt Betonu'nda Çimentonun Karışım Performansı Üzerindeki Etkisi, KTÜ, Trabzon | | |
Method of Assessment | Type of assessment | Week No | Date | Duration (hours) | Weight (%) | Mid-term exam | 9 | | 1 | 30 | Presentation | 12 | | 1 | 20 | End-of-term exam | 14 | | 1,5 | 50 | |
Student Work Load and its Distribution | Type of work | Duration (hours pw) | No of weeks / Number of activity | Hours in total per term | Yüz yüze eğitim | 3 | 14 | 42 | Sınıf dışı çalışma | 4 | 12 | 48 | Laboratuar çalışması | 2 | 8 | 16 | Arasınav için hazırlık | 8 | 1 | 8 | Arasınav | 1 | 1 | 1 | Uygulama | 3 | 10 | 30 | Ödev | 4 | 8 | 32 | Dönem sonu sınavı için hazırlık | 12 | 2 | 24 | Dönem sonu sınavı | 1.5 | 1 | 1.5 | Total work load | | | 202.5 |
|